800 rue Saint-Jacques (Banque Nationale) - 46 étages

Recommended Posts

Pinned posts

Siège social de la Banque Nationale

BNC2.jpg

BNC.pngBNC.jpg

(autres images dans la citation)

Citation

Emplacement: Part de l'îlot Robert-Bourassa, Saint-Jacques, Notre-Dame, Gauvin
Hauteur en étages: 46
Hauteur en mètres: ≤ 200m
Coût du projet: 
Promoteur: Banque Nationale
Architecte: Menkès Shooner Dagenais LeTourneux
Entrepreneur général: Broccolini
Début de construction: Automne 2018
Fin de construction: 2022
Site internet: 
Lien webcam: 
Autres images: 
BNC.jpg

BNC3.jpg

BNC4.jpg
Vidéo promotionnelle: 
Rumeurs: 
Autres informations:

  • Nouveau siège social de la Banque Nationale
  • L'immeuble sera occupé exclusivement par la Banque Nationale. 
  • Le bâtiment sera conçu conformément aux normes environnementales et de qualité les plus avancées. 
  • Le concept de l'édifice sera finalisé au cours des prochains mois dans le cadre d'un concours architectural mené par invitation. 
  • La Banque privilégiera l'utilisation de matériaux et de services issus du Québec et du Canada, provenant d'entreprises clientes, dans toutes les facettes de ses travaux. 
  • Une grande attention sera accordée à la mise en valeur historique du site et de ses différentes composantes. 
  • La tour hébergeant l'actuel siège social au 600, rue de la Gauchetière Ouest sera mise en vente prochainement. Le produit de la vente sera consacré aux travaux à venir.

 

Partager ce message


Lien à poster
Partager sur d’autres sites
32 minutes ago, Archi Mtl said:

La Banque Nationale revient dans la rue Saint-Jacques. La plus importante institution bancaire de la province a décidé de mettre en vente son actuel siège social – situé au coin de la rue de la Gauchetière et de la côte du Beaver Hall – pour se construire un nouveau quartier général de 36 étages, à peine quelques pas plus loin, au coin de la rue Saint-Jacques et du boulevard Robert-Bourassa.

Il s’agit d’un projet de plus d’un demi-milliard de dollars qui devrait être terminé d’ici cinq ans. La banque sera le seul et unique occupant de l’édifice.

« Ça sera la plus grosse tour à bureaux à Montréal depuis 25 ans [1 million de pieds carrés], soit depuis la construction du 1250 René-Lévesque au début des années 90 », soutient le PDG Louis Vachon, en entrevue avec La Presse.

« Ça va faire près de 40 ans que nous occupons notre édifice actuel. Ce n’est pas un luxe. »— Louis Vachon

Tel que rapporté par La Presse vendredi dernier, le promoteur Broccolini s’est récemment porté acquéreur d’un terrain de 135 000 pieds carrés en bordure de l’ancienne autoroute Bonaventure. Louis Vachon indique que la Banque Nationale a conclu une entente avec Broccolini, jeudi dernier, pour devenir propriétaire d’un peu plus de la moitié de ce terrain (85 000 pieds carrés).

« On le fait dans le but d’améliorer nos espaces de travail afin qu’ils soient collaboratifs, modernes et technologiques. C’est vraiment pour la rétention et le recrutement des employés », dit le PDG.

Cette décision démontre à quel point les espaces de travail jouent un rôle de taille de nos jours. « Ça devient un avantage comparatif important », lance Louis Vachon.

La banque suit une certaine tendance qui s’en va vers des espaces de bureaux plus ouverts, sans obstacles vis-à-vis des fenêtres, laissant pénétrer la lumière du jour, avec peu de bureaux individuels attitrés, etc.

RÉNOVATIONS EN COURS

Le choix de déménager survient alors que la banque rénove ses bureaux actuels, étage par étage, depuis l’automne 2016. Cinq des 20 étages ont jusqu’ici été rénovés au coût d’environ 3 millions par étage.

« On rénovait étage par étage et on voyait venir une facture de 150 millions pour continuer à rénover des étages ici et dans d’autres édifices où des employés de la banque travaillent. Alors, on s’est demandé s’il n’était pas préférable de prendre cette enveloppe de 150 millions ainsi que le produit de la vente de l’édifice de notre siège social pour se construire un nouvel édifice. Pour pas beaucoup plus cher, on peut se construire un nouveau siège social », raconte Louis Vachon.

Même si elle se prépare à déménager, la banque entend continuer de procéder à certains travaux de rénovations sur la rue de la Gauchetière.

« On n’arrêtera pas complètement, mais on va ralentir le tempo. »

— Louis Vachon

Pour des raisons de sécurité, tous les employés de la banque ne seront pas regroupés dans le nouvel édifice. Mais plus de 3000 employés y déménageront, alors qu’ils sont actuellement environ 2000 aujourd’hui au siège social. « On va garder au moins 500 000 pieds carrés à l’extérieur de notre siège social », dit Louis Vachon.

La première pelletée de terre est prévue au printemps, une fois que le concept final aura été décidé. Les détails du projet pourraient bien être dévoilés aux actionnaires de la banque à l’occasion de l’assemblée annuelle, qui se déroule habituellement en avril.

Avant d’être installé rue de la Gauchetière, le siège social de la Banque Nationale était situé dans deux édifices de la rue Saint-Jacques. « Il avait été décidé de construire un nouvel édifice [rue de la Gauchetière] en 1983 après la fusion de la Banque Canadienne Nationale avec la Banque Provinciale du Canada afin de regrouper les deux sièges sociaux qui étaient là [rue Saint-Jacques] depuis les années 20 », dit Louis Vachon.

UNE TOUR DE PRESTIGE

L’allure du projet immobilier de la Banque Nationale reste encore à définir, mais la future tour de 36 étages sera une des plus hautes à Montréal. À titre de comparaison, la tour Deloitte, construite il y a trois ans, compte 26 étages, alors que Place Ville Marie a 46 étages et que le 1250 René-Lévesque – qui s’est notamment fait connaître sous le nom de Tour IBM – est un gratte-ciel de 47 étages.

 

QUATRE CHOSES À SAVOIR SUR LE FUTUR SIÈGE SOCIAL

Certifications 

« ON VA CONSTRUIRE L’ÉDIFICE SELON LES MEILLEURES NORMES ENVIRONNEMENTALES ET DE QUALITÉ LES PLUS AVANCÉES (LEED), AINSI QUE SELON LES NORMES FAVORISANT LE BIEN-ÊTRE DES OCCUPANTS (WELL) », ASSURE LE PDG DE LA BANQUE NATIONALE, LOUIS VACHON.

Gym, garderie et concours

« IL Y AURA UNE CAFÉTÉRIA ET UN GYMNASE, MAIS AUSSI UNE GARDERIE CORPORATIVE. » L’ACTUELLE GARDERIE DE LA BANQUE EST À L’EXTÉRIEUR DE SON SIÈGE SOCIAL. « POUR LE DESIGN ET LES PLANS, UN CONCOURS SERA ORGANISÉ AUPRÈS D’ARCHITECTES EN FÉVRIER, ET ON VA TENTER DE PROCÉDER À UNE SÉLECTION POUR LA FIN DU MOIS DE MARS. »

Achats locaux

« ON VA PRIVILÉGIER L’UTILISATION DE MATÉRIAUX ET DE SERVICES ISSUS DU QUÉBEC ET DU CANADA DANS TOUTES LES FACETTES DES TRAVAUX. ON SOUHAITE QUE NOS ACHATS POUR LA CONSTRUCTION REFLÈTENT NOTRE EMPREINTE SOCIO-ÉCONOMIQUE, C’EST-À-DIRE PLUS DE 50 % DE NOS AFFAIRES AU QUÉBEC ET PLUS DE 90 % DE NOS AFFAIRES AU PAYS. ON PENSE QU’ON EST CAPABLES D’ACHETER LOCAL AUPRÈS DE NOS CLIENTS SANS SACRIFIER LA QUALITÉ ET LE PRIX. »

Modifié par _mtler_

Partager ce message


Lien à poster
Partager sur d’autres sites

Dans l'article ça dit que la BNC a eu une entente avec avec Broccolini pour devenir propriétaire de la moitié du terrain... ça veux dire que Brocco leur a vendu le terrain? Est-ce que Brocco est encore dans le projet? 

Partager ce message


Lien à poster
Partager sur d’autres sites
il y a 13 minutes, mark_ac a dit :

36 floors = 145/150M?

1250 Rene Levesque fait 199m pour 47 étages donc j’imagine que 36 etages peut être plus haut qur 150m

Partager ce message


Lien à poster
Partager sur d’autres sites

J'ai vu ca ce matin!

http://www.lapresse.ca/affaires/economie/immobilier/201801/23/01-5151073-la-banque-nationale-ramene-son-siege-social-rue-saint-jacques.php

Un bon scoop! :D

Citation

UNE TOUR DE PRESTIGE

L'allure du projet immobilier de la Banque Nationale reste encore à définir, mais la future tour de 36 étages sera une des plus hautes à Montréal. À titre de comparaison, la tour Deloitte, construite il y a trois ans, compte 26 étages, alors que Place Ville Marie a 46 étages et que le 1250 René-Lévesque - qui s'est notamment fait connaître sous le nom de Tour IBM - est un gratte-ciel de 47 étages.

...

 

Modifié par djsteph

Partager ce message


Lien à poster
Partager sur d’autres sites

Ce ne sont clairement pas de mauvaises nouvelles, on parle même d'une hauteur supérieure à ce qui était prévue par des projets antérieurs à cet emplacement. Il appert qu'on a de plus grandes ambitions/attentes que par le passé à Montréal, ce qui est une bonne chose. J'espère qu'on puisse trouver une solution pour se rapprocher du 200m aussi. 

Partager ce message


Lien à poster
Partager sur d’autres sites

C'est vraiment une excellente nouvelle!

Je retiens surtout « Pour le design et les plans, un concours sera organisé auprès d'architectes en février, et on va tenter de procéder à une sélection pour la fin du mois de mars. »

Enfin on s'intéresse à la qualité!

Partager ce message


Lien à poster
Partager sur d’autres sites

Créer un compte ou se connecter pour commenter

Vous devez être membre afin de pouvoir déposer un commentaire

Créer un compte

Créez un compte sur notre communauté. C’est facile !

Créer un nouveau compte

Se connecter

Vous avez déjà un compte ? Connectez-vous ici.

Connectez-vous maintenant

  • Contenu similaire

    • Par IluvMTL
      Proposition:  
      A feasibility study to consider the addition of a tramway line or bus route on McTavish Street to facilitate access to the Belvedere Kondiaronk/Chalet and other areas up the hill from downtown, especially for seniors and the mobility/physically challenged, but also to serve other users.
      Objective
      Making the Mont-Royal and other points up the hill more accessible 
      As it now stands, as far as reaching the lookout or chalet is concerned, the Peel steps and various inclines encountered are out of the question for many, including families. The closest alternate route by public transit is via Guy, plus 2 buses and a walk. That is not very convenient for many. Another important consideration is that there are no elevators in the Guy metro for people who need them.  The McTavish tramway could let people off in the Allan Memorial Institute parking lot, a few steps from the  Route Olmstead which has a much gentler slope for going the rest of the way to the lookout. If a bus route is the option selected, the service could be seasonal, or only in service on week-ends, holidays and special events. Advantages
      A tramway would be an enticement to visit the mountain, and more often, since it would be much simpler and quicker for tourists and montrealers to reach the lookout. It would also ensure that the chalet be better utilized since it would be so much easier to get to, no matter the season. More concerts and special events could be held there throughout the seasons. Since the McTavish line tramway would run though the McGill Campus, it would also be a N-S shuttle of sorts, getting McGill students and employees between the various campus buildings and the REM/Metro/downtown. This line could also be used for residents in the Square Mille, McGill Ghetto as well people going to games at Molson stadium or the other McGill athletic facilities. Being part of the Fleuve-Montagne makes it an natural draw for tourists and this line is only steps away from the main tourist office on Square Dorchester as well as Sainte-Catherine and may major hotels. People could also transfer to the ave des Pins bus for other points east and west. The line is a short hop from McGill Metro, the REM and Central Station, making it part of the hub. The route could be extended further southward to the Tourist office at Dorchester or  widened to cover a broader area if need be. This line would be an alternative to the bus lines that run north, on Guy and du Parc. Easier public access means fewer private cars and tour busses traveling to the mountain, and fewer vehicles on the road. The Kondiaronk summit on Mont-Royal is a major tourist attraction, Let's facilitate access for all groups.
      McTavish Tramway Route (in orange)

    • Par IluvMTL
      http://plus.lapresse.ca/screens/6ae8dd35-0e0b-48e3-b1cb-dec9a5e92473%7CHFo3prp1wfb0.html
       
      Édition du 8 août 2015,
       
      UNE NOUVELLE BRASSERIE À MONTRÉAL
       
      À titre de président du conseil de Molson Coors, Geoff Molson aura une fin d’année bien remplie alors qu’il confirme que l’entreprise brassicole est à compléter une étude qui déterminera si elle construira une nouvelle usine ou rénovera ses installations de la rue Notre-Dame.
       
      Une chose est certaine : le statu quo n’est plus possible et, selon Geoff Molson, la brasserie bicentenaire devrait normalement déménager dans des installations le plus modernes possible. On parle d’investissements qui pourraient dépasser les 300 millions.
       
      « Il faut moderniser notre production et surtout augmenter notre capacité d’embouteillage. Notre brasserie de Montréal ne peut pas produire de la bière en cannettes, et c’est une tendance lourde du marché que l’on observe aux États-Unis. »
       
      — Geoff Molson
       
      « On pourrait construire une nouvelle usine sur nos terrains à proximité de notre centre de distribution de la rue Dickson et vendre nos installations de la rue Notre-Dame à une tierce partie, à la condition que l’on ouvre le site sur le fleuve.
       
      « Ce serait une façon extraordinaire de faire exploser le Vieux-Port de Montréal et de donner, à partir du pont Jacques-Cartier, une belle vitrine sur le fleuve à la population de Montréal », évoque Geoff Molson.
       
      Chose certaine, il n’est pas question que Molson Coors quitte le site qui a vu naître les activités du groupe il y a 230 ans sans y laisser une marque commémorative indélébile.
       
      « On pourrait y construire une microbrasserie, ce qui laisserait l’empreinte de Molson sur le site et perpétuerait l’activité qu’on y pratique depuis plus de deux siècles », propose le président du conseil de Molson Coors.
       
      On saura au début de 2016 si le conseil d’administration disposera de la proposition et de la vision que vient de partager avec nous son président.
       
      sent via Tapatalk
    • Par IluvMTL
      http://ville.montreal.qc.ca/portal/page?_pageid=7317,79867570&_dad=portal&_schema=PORTAL

      COMITE CONSULTATIF D'URBANISME
      13 septembre 2018
      3001459117 et 3001431020
      4.6.39

      DEMANDE  DE CERTIFICAT  D'AUTORISATION DE  DEMOLITION ET DEMANDE DE PERMIS DE CONSTRUCTION
      639-643,rue Notre-Dame Ouest
      La demande  vise a autoriser Ia demolition du batiment ainsi que Ia construction  d'un  hotel de  5  etages  comprenant   21  chambres   et  un restaurant au rez-de-chaussee.
      Le toil,  les  planchers  ainsi que  toute Ia structure  du batiment  existant seront  demolis.    
      Les fac;ades avant  et  arriere  seront  conservees, mais plus de 40% du volume hors-sol sera demoli, done le projet doit etre traite comme   une   demolition   et  une   nouvelle   
      construction.   II  s'agit   d'un immeuble  de 3 etages hors sol, avec une fac;ade de pierre grise, construit en 1891.  Les 2e et 3e etages ainsi que son couronnement  ant conserve leur integrite.  La vitrine commerciale  du rez-de-chaussee ainsi que Ia fac;ade arriere ant ete largement modifiees.

       
    • Par monctezuma
      400 René-Lévesque Ouest
      (Aucun rendu pour le moment)
       
    • Par IluvMTL
      Radio-Canada vend sa tour au Groupe Mach | Le Devoir
       
      L’avenir de la tour
      Pour sa part, la tour de Radio-Canada a été cédée au Groupe Mach, qui mettra aussi la main sur la section ouest du vaste terrain.
      La société immobilière détenue l’homme d’affaires Vincent Chiara occuperait le quatrième rang des propriétaires d’immeubles commerciaux dans la grande région de Montréal. Avec son associé Jolina Capital inc., l’entreprise est notamment propriétaire de la tour de la Bourse et de la tour CIBC.
      Radio-Canada avait reçu une douzaine d’offres pour l’achat de sa tour, et le diffuseur s’était associé à la firme de courtage immobilier Avison Young et Brookfield Financial pour procéder à l’analyse des offres d’achat. Quatre propositions avaient par la suite été retenues.
      Le Groupe Mach a refusé mercredi de commenter la transaction ou de révéler ses intentions concernant l’avenir de la tour dont il a fait l’acquisition.
       
      ICI Radio-Canada - Communiques - La nouvelle Maison de Radio-Canada
       
      ...
       
      En lien direct avec la Stratégie pour le centre-ville présentée par l’administration Coderre et en vertu de l’accord de développement conclu avec la Ville de Montréal et le règlement d’urbanisme de l’arrondissement, la revitalisation du quadrilatère occupé actuellement par Radio-Canada devrait inclure une mixité d’usages comprenant notamment des logements sociaux et communautaires, des logements abordables et des espaces verts.
       
      La proposition de Groupe Mach prévoit aussi une éventuelle reconnexion de certaines rues, pour favoriser une meilleure intégration avec le reste du quartier. Cette stratégie de développement s’inscrit dans la tendance mondiale de densification des centres urbains à la faveur d’un développement durable.
      LA TOUR ACTUELLE SERA PRÉSERVÉE
      Dans le cadre de ce vaste projet de revitalisation, Groupe Mach prévoit, dans son plan actuel, que la tour de Radio-Canada soit préservée, mais avec une nouvelle vocation.
      Rappelons enfin que ces deux transactions sont sujettes à l’approbation globale du Conseil du Trésor qui est prévue pour le printemps 2017. Selon l’échéancier présenté par le groupe Broccolini, la construction de la nouvelle Maison de Radio-Canada devrait être complétée pour le début de 2020.
      En lien direct avec la Stratégie pour le centre-ville présentée par l’administration Coderre et en vertu de l’accord de développement conclu avec la Ville de Montréal et le règlement d’urbanisme de l’arrondissement, la revitalisation du quadrilatère occupé actuellement par Radio-Canada devrait inclure une mixité d’usages comprenant notamment des logements sociaux et communautaires, des logements abordables et des espaces verts. La proposition de Groupe Mach prévoit aussi une éventuelle reconnexion de certaines rues, pour favoriser une meilleure intégration avec le reste du quartier. Cette stratégie de développement s’inscrit dans la tendance mondiale de densification des centres urbains à la faveur d’un développement durable.
      À propos de Groupe Mach
      Groupe Mach est l’un des principaux acteurs du secteur de l’immobilier québécois et l’un des plus importants propriétaires d’édifices à bureaux de Montréal et de la ville de Québec. Il développe ou redéveloppe des sites et les amène à maturité, en respectant des objectifs pratiques et réalistes en s’associant à des partenaires expérimentés tels que la firme Provencher Roy et le Groupe Montclair. Ces sites deviennent, grâce à une gestion avisée, des générateurs de nouveaux emplois et de services à la collectivité.
      Groupe Mach se distingue par sa vision stratégique, son expertise et son savoir-faire. Sa volonté de concilier les impératifs techniques, économiques, sociaux et environnementaux fait de lui un développeur et un gestionnaire rigoureux, responsable et intègre.
      Depuis bientôt 17 ans, il travaille à la composition d’un portefeuille immobilier prestigieux et bien équilibré couvrant tous les secteurs d’activité. Il regroupe plusieurs fleurons québécois tels que l’édifice Sun Life, la Tour CIBC et la Tour de la Bourse à Montréal. Il détient, à ce jour, 17 millions de pieds carrés.
      Avec plusieurs propriétés certifiées BOMA Best ou LEED, il remplit sa promesse de participer à l’effort collectif pour un développement durable et compte poursuivre dans cette voie en visant les plus hauts standards de l’industrie.