franktko

CTBUH Crowns Ping An Finance Center as World's 4th Tallest Building

1 message dans ce sujet

PAFC_Overall_(c)PingAnFinanceCenter.jpg

 

The Council on Tall Buildings and Urban Habitat (CTBUH) has announced the completion of the Ping An Finance Center in Shenzhen, China, according to CTBUH tall building criteria. At 599 meters (1965 feet), it is now officially the second tallest building in China and the fourth tallest in the world, behind only the Burj Khalifa, Shanghai Tower and Makkah Royal Clock Tower.

 

Designed by Kohn Pedersen Fox Associates (KPF), the Ping An Finance Center is located in the heart of Shenzhen’s Fuitan District. The building contains over 100 floors of office space located above a large public podium, with a multi-story atrium providing retail, restaurants and transit options to the city and greater Pearl River delta region.

 

Height-to-Architectural-Top_EN_(c)CTBUH.jpg

 

The CTBUH describe the form of the tower as a “taught steel cable, outstretched by the sky and the ground at once. At the top of the tower, the façade tapers to form a pyramid, giving the tower a prismatic aesthetic.” The form is further emphasized by eight composite “megacolumns” along the building envelope that streamline the building for improved structural and wind performance, reducing baseline wind loads by 35 percent.

 

The facade of the building is one the project most innovative features; its use of 1,700 tons of 316L stainless steel make the envelope the largest stainless steel facade system in the world. The specific material was chosen for its corrosion-resistance, which will allow the building to maintain its appearance for decades even in the city’s salty coastal atmosphere.

 

http://www.archdaily.com/868015/ctbuh-crowns-ping-an-finance-center-as-worlds-4th-tallest-building

Partager ce message


Lien à poster
Partager sur d’autres sites

Créer un compte ou se connecter pour commenter

Vous devez être membre afin de pouvoir déposer un commentaire

Créer un compte

Créez un compte sur notre communauté. C’est facile !


Créer un nouveau compte

Se connecter

Vous avez déjà un compte ? Connectez-vous ici.


Connectez-vous maintenant

  • Contenu similaire

    • Par Gilbert
      Nom: Tour des Canadiens
      Hauteur en étages: 50
      Hauteur en mètres: 167
      Coût du projet: 230 000 000,00$
       
      Promoteur: Cadillac Fairview / Canderel / Canadiens de Montréal / Fond de solidarité FTQ
      Architecte: IBI/CHA (Cardinal Hardy) / Martin Marcotte / Beinhaker
      Entrepreneur général:
      Emplacement: Site de la Place du Centenaire (Centre Bell)
       
      Début de construction: printemps 2013
      Fin de construction: 2016
       
      Site internet: Site Officiel Tour des Canadiens 2 | Condos a vendre Montreal
       
      Lien webcam: ICI
       
      Autres informations:
       
      * 552 appartements en copropriété à partir du 15ème étage
      * RDC commercial avec sports bar which will provide its clients with a unique and unparalleled experience
      * 13 étages de stationnements au dessus du RDC
      * 14ème étage pour services (spa, piscine, etc.)
      * Prix médian des condos : 550,00$/p2
      * Superficies des condos : 332 pi² - 2 000 pi² (Penthouse)
      * Lien piétonnier à l'intérieur de la tour vers la gare
      * A lightbox featuring Montreal and its lifestyle will be encased in the building podium
      * Mr. Molson indicated that the hockey statues as well as the bricks purchased by fans will be removed from Centennial Place and stored elsewhere in order to ensure their integrity and protect them for the duration of the construction period. These testimonials to the Canadiens' centennial will once again be accessible to the public at the end of construction within the environs of the new building.
      * Les propriétaires d’unités dans l’édifice recevront quelques avantages liés à l’équipe de hockey, dont une séance privée annuelle de patinage sur la glace ou les joueurs évoluent chaque saison.
      * L’extérieur de l’édifice sera constitué de vitres et de panneaux de ciment polis de deux tons différents
      * 100% vendu
       
      Rumeurs:
       
      Aperçu du projet:
       

      Photo : lake of the nations, sur Flickr
       
      Vidéo promotionnelle:
       
      Historique, informations générales et + sur ce projet : http://www.mtlurb.com/forums/en-construction-going-up/18863-tour-canadiens-50-etages-post114241.html#post114241
    • Par MARTY
      Just south of the Metropolitan in a 3 building mall where Zellers, an old Maxi and the infamous Millenium Club were doing business for years is now completely vacated and is just waiting for the wrecker's ball. This is a huge site that can easily accomodate 10 or more condo towers like the Villa Latella on Boul. des Galleries d'Anjou. Just south on Jean Talon near Provencher the 6 storey Bellavista condo building is having it's underground garage carved out. This great to see!! the whole island is rocking with development!!
    • Par bucketsofrain
      And... Yet another condo project in the Sud-Ouest borough of Montreal. Nice old building...
       

       
      Name: La Machinerie - http://lamachinerie.ca/
      Location: 3601 Rue Saint-Jacques - http://maps.google.com/maps?q=Montreal,+QC,+Canada&hl=en&ie=UTF8&ll=45.480793,-73.582794&spn=0.000982,0.002226&sll=37.0625,-95.677068&sspn=36.042042,72.949219&oq=montrea&hnear=Montreal,+Communaut%C3%A9-Urbaine-de-Montr%C3%A9al,+Quebec,+Canada&t=h&z=19&layer=c&cbll=45.480794,-73.583303&panoid=2bdUgkr56bVw5yuN9cb0nA&cbp=12,332.54,,0,-18.51
    • Par GDS
      This lot is for now sale. The proposal is being used just to show the potential of the lot, but I thought it was worth posting anyways. Even more development soon be scheduled around the Bell Center.
       

       

    • Par Olivier2160
      Je suis passé la semaine dernière et j'ai parlé avec le vendeur et j'ai vu la présentation des unités sur un espèce d'écran 3D du building (trop cool) et effectivement, environ la moitié du building était en rouge, donc vendues (surtout du côté Nord, là ou la vue ne sera pas bloquée par le Roccabelle, Avenue des Canadiens etc..). Il m'a dit que la construction devrait débuter en mars et prendre environ 1 an et demi pour les fondations, et ensuite, un étage par semaine pour le reste. Il m'a également dit que la 2e tour était pour du commercial seulement.
       
      De plus, il m'a dit qu'un projet de condo de 30 étages allait bientôt être annoncé dans le parking au Nord de la 1ere tour (juste à l'ouest des tours Samcon) et que donc, des clients ayant acheté du côté Nord de la tour pour avoir une vue, allait finalement la perdre.
       
      Chose certaine, selon le vendeur, les choses vont très bien pour ce projet, mais c'est un vendeur ;-)
       
      Site actuel : https://maps.google.ca/maps?q=Piazza+G.+Agnelli,+10,+rome&hl=fr&ll=45.497407,-73.574034&spn=0.000004,0.002401&sll=41.899023,12.479805&sspn=0.050661,0.076818&t=h&gl=ca&hnear=Via+Virginia+Agnelli,+10,+Roma,+Lazio,+Italie&z=19&layer=c&cbll=45.497407,-73.574034&panoid=B3_Kr9HGDNb7csz6J0EmuQ&cbp=12,37.92,,0,3.42