Silos Canada Malting
(concept)

silos canada malting.jpg

Citation

Emplacement: 
Hauteur en étages: 
Hauteur en mètres: 
Coût du projet: 
Promoteur: 
Architecte: 
Entrepreneur général: 
Début de construction: 
Fin de construction: 
Site internet: 
Lien webcam: 
Autres images: 
Vidéo promotionnelle: 
Rumeurs: 
Autres informations: 

 

Partager ce message


Lien à poster
Partager sur d’autres sites

Voici une autre proposition du bureau d'architectes Karl Fischer

Lennox Avenue

 

J'aime bien ce qu'il font, ils sont aussi les concepteurs du TOM et je crois le défunt Victoire sur St-Jacques. Mais la plupart de leurs projet se trouvent à New-York.

 

En ce qui a trait au Silo Canada Malting, j'aime bien et j'espère que cette proposition ira de l'avant.

 

Partager ce message


Lien à poster
Partager sur d’autres sites

https://montreal.ctvnews.ca/stunted-silos-pushing-to-restore-the-canada-malting-site-1.3724857

Stunted Silos: Pushing to restore the Canada Malting Site

CTV Montreal 
Published Saturday, December 16, 2017 7:15PM EST 
Last Updated Sunday, December 17, 2017 6:42PM EST

The Canada Malting site along the Lachine Canal in St. Henri has been abandoned for more than 40 years.

Developers want condos; the community wants to take it back. All the while, the site is stagnant and slowly falling to ruin.

Since its abandonment, the site is blanketed by graffiti – some consider it too dangerous to enter, and its presence has been the topic of many heated debates.

“It’s been difficult—ultimately there’s a lot of elements involved in this project that have to be taken into consideration,” explained Noam Schnitzer of Renwick Development.

One of those elements is the consideration of how to develop the site while maintaining both its historical significance, and the needs of its surrounding community.

Schnitzer is pushing for the development of more parks, artistic spaces, and social housing.

“It is a community project : this is a social impact development, pure and simple,” he said. “The prevision of the 175 family condos should have been seen only as the facilitator in all of this, in our bid to show a private development group can address social requirements in a sustainable manner.”

The borough has told the developer it will examine the proposal.

Of the 240 units, 64 would be set aside exclusively for low-cost housing – an initiative included within the project’s $45 million price tag.

A Nous la Malting – or ‘take back the Malting – is a community group in St. Henri that’s been crusading for the silo’s redevelopment through a public project.

In a statement, the borough said it supports a preliminary project presented by A Nous la Malting – but the remaining question is how to fund it.

“At the end of the day, it’s going to require public funds, so we’re really hoping that the city, the province, and the federal government will chip in the funds for the project, and we can do our own fundraising for the project,” said Shannon Franssen of Solidarite St. Henri, a community group campaigning to increase quality of live for residents of the borough.

One artist mentioned that the restoration of the silos will add to its historical and artistic value.

“It’s not about money – it’s about sharing a historical piece and keeping an art value to it,” they explained.

 

Partager ce message


Lien à poster
Partager sur d’autres sites

https://www.theglobeandmail.com/real-estate/condo-developments-in-montreals-lachine-canal-drawpushback/article37557004/

Development plans dredge up thorny issues

The Lachine Canal, once full of warehouses and silos, is now one of Montreal's busiest sites for residential construction. Not everyone is happy

MONTREAL
SPECIAL TO THE GLOBE AND MAIL
PUBLISHED 1 DAY AGOUPDATED JANUARY 11, 2018

At the turn of the 20 th century, Montreal's Lachine Canal was a North American industrial powerhouse with sprawling factories packed shoulder-to-shoulder along the narrow waterway.

By the 1970s, the flour and textile mills, breweries, iron works and other manufacturers were moving away or shutting down as activity shifted elsewhere and the opening of the St. Lawrence Seaway diverted shipping away from the canal.

Left behind was a unique urban footprint: a postindustrial landscape of derelict warehouses, abandoned malt silos and empty red-brick hydraulic works. In the 1990s, the area – southwest of downtown Montreal – was being reclaimed as a recreational and tourist destination.

The canal was cleaned up, Parks Canada had taken over and built a popular network of bicycle paths and the sector was declared a historic site. Aging 19 th-century industrial buildings began to be transformed into trendy loft and office spaces.Today, the Lachine Canal is in the throes of another transformation. The district has been turned into a condo developer's paradise, with dozens of mid-priced to luxury buildings going up along the landscaped banks and on nearby streets.

With its proximity to the downtown, scenic tree-lined paths and easy access to public transit as well as such amenities as the nearby Atwater Market and a burgeoning number of local trendy watering holes and eateries, the location is one of the city's busiest sites for residential – mostly condo – construction.

Clearly, the revitalization and redevelopment have been a boon for what was an economically depressed sector that witnessed an exodus of the mostly working-class residents once employed by the thousands in the factories. There is a return influx of people and city governments are more than pleased at the expansion of their residential tax base.

But there has also been pushback by local residents who feel the condo development has gone overboard, with too little social or affordable new housing and not enough emphasis on building new schools, parks, grocery stores and social services.

The canal district is a living laboratory in the dynamics of urban planning amidst runaway private residential development. The stunning victory of the left-of-centreProjet Montréal municipal party in the citywide November mayoral contest raises the stakes for developers: the new mayor, Valérie Plante, is committed to building more social and family-oriented housing in the city and putting the brakes on construction of the typical one- or two-bedroom condos primarily targeting the professional class.

Condo developers in the canal district say they are open to the idea of a new urban game plan more receptive to the needs of the community.

"Montreal's southwest is sort of ground zero for a lot of debates on gentrification and deindustrialization," Concordia University history professor Steven High said. Condo construction has "been proceeding at a tremendously rapid pace without a lot of thinking."

"There are a lot of pluses about densification, but a lot of questions about what kind of place is being created there."

Denis Robitaille, president and founder of developer Conceptions Rachel-Julien, is putting up Phase 4 of the company's Bassins du Havre condo project in Griffintownon land formerly occupied by a Canada Post sorting facility; the project is in partnership with real estate developer Le Groupe Prével. "We're quite comfortable providing affordable housing," Mr. Robitaille said. "We don't have any concerns over that."

Of the 550 units in the 20-storey Bassins du Havre tower, 15 per cent will be in the affordable housing category – in the $280,000 range – Mr. Robitaille said.

The Bassins du Havre project incorporates water into its design, featuring terraces made to look like docks.

The Bassins du Havre project incorporates water into its design, featuring terraces made to look like docks.

RACHEL JULIEN

Some of the project's features are meant to tap into the themes of water and the canal's rich industrial history: There are private terraces made to look like docks, as well as rooftop pools and spa services.

The old Canada Post site is also the location for a publicly funded social-housing project. A municipal agency in the Sud-Ouest borough has a partnership agreement with non-profit organization Bâtir son quartier for the development of 235 rental and 78 condo units, slated for delivery in 2019. Condo availability is limited to first-time home buyers or families, spokeswoman Leslie Molko said.

The project will include shops on the ground-floor level.

In the nearby Saint-Henri neighbourhood, the abandoned, graffiti-covered Canada Malting Silos facility – whose first phase was built in 1905 – is the focus of an ambitious mixed-use and restoration project by Renwick Development. Besides family-oriented residences, there are plans for commercial space, a section for artists' studios and exhibition quarters, public green spaces with access to the canal, an early childhood and autistic rehabilitation centre and an observation tower. The property – containing 240 to 260 residences – will make room for 65 to 80 social-housing units, Renwick founder and president Noam Schnitzer said. "Development in the southwest needs to be community oriented. This, for us, is Canada Malting.

"We want to bring the site back into the community in a very meaningful and sustainable manner." 

Concept rendering, Canada Malting redevelopment, Montreal.

A concept rendering of the Canada Malting redevelopment.

KARL FISCHER ARCHITECT

Shannon Franssen, a spokeswoman for À nous la Malting, a community group opposed to the Canada Malting redevelopment as envisaged by Renwick, says the project doesn't sufficiently address the neighbourhood's serious affordable- and social-housing needs. "It's one of the last sites that's available for social housing along the Lachine Canal," she said. "Many low-income residents are being forced to move out because of gentrification" and Renwick's proposal is essentially a luxecondo project with a bit of window dressing to address community and social housing needs, she said.

The group wants municipal authorities to acquire the land and come up with plans for a public only project with a much higher ratio of social and affordable residences.

"I understand their position. I understand where they're coming from," Mr. Schnitzer said. "But this is a project that addresses the needs of the community."

Montreal and New York City architect Karl Fischer says his firm has prepared "a comprehensive design package for the revitalizing of Canada Malting and including social housing." The proposal has been submitted to the city for review, he said. Mr. Schnitzer anticipates the approvals process to resume in January with groundbreaking tentatively scheduled for October, 2018.

Whatever shape the former malt works ends up taking, it's clear – especially with the arrival of Projet Montréal at the helm of city government – that the entire canal district will be subject to much closer, more rigorous scrutiny of any new residential real estate development in the sector.

Partager ce message


Lien à poster
Partager sur d’autres sites

Extrait : 

Montreal and New York City architect Karl Fischer says his firm has prepared "a comprehensive design package for the revitalizing of Canada Malting and including social housing." The proposal has been submitted to the city for review, he said. Mr. Schnitzer anticipates the approvals process to resume in January with groundbreaking tentatively scheduled for October, 2018.

Partager ce message


Lien à poster
Partager sur d’autres sites

Créer un compte ou se connecter pour commenter

Vous devez être membre afin de pouvoir déposer un commentaire

Créer un compte

Créez un compte sur notre communauté. C’est facile !

Créer un nouveau compte

Se connecter

Vous avez déjà un compte ? Connectez-vous ici.

Connectez-vous maintenant

  • Contenu similaire

    • Par UrbMtl
      Vision 62

       
    • Par ChrisDVD
      New housing for St. Henri on Canada Malting site?
       

       
      APRIL 14, 2013
       
      MONTREAL — The Canada Malting complex has towered over St. Henri for more than a century.
       
      A symbol of Montreal’s industrial past, it has fallen on hard times since it was abandoned in the 1980s. It’s defaced by graffiti, and squatters often break in.
       
      Now, the Sud-Ouest borough is working on guidelines for a possible eventual residential redevelopment of the sprawling property at St. Ambroise and St. Rémi Sts., on the Lachine Canal.
       
      After consulting experts, neighbours and local groups, the borough announced on Friday it is working on a framework that will be put before public consultations.
       
      Once Canada’s largest malting plant, Canada Malting’s oldest section was built in 1905. The privately owned complex features enormous silos, some of which are unique in North America. But the borough said some are crumbling and will be difficult to save. If a residential property is built, other challenges will involve traffic and parking, the borough said.
       
      “It’s a monumental building and preserving it presents monumental challenges,” Sud-Ouest borough Benoit Dorais said in a press release.
       
      “All options are on the table,” he added. “We hope to see a project that meets the principles and values that inspired the development of the area in recent years — an inclusive project where families play an important role, one that is focused on sustainable development and the history and identity of the neighbourhood.”
       
      Groups already consulted include Heritage Montreal, Parks Canada and Solidarité Saint-Henri. Guy Giasson, president of the Société historique de Saint-Henri, said the group hopes any redevelopment of Canada Malting will preserve and reuse the complex, as other former plants on the canal have been.
       
      Other industrial buildings have been turned into condos and artist lofts.
       
       
      Read more: http://www.montrealgazette.com/housing+Henri+Canada+Malting+site/8241376/story.html#ixzz2Qa3GUXRZ
    • Par ScarletCoral
      via La Voix Pop :
       
      9/01/2016 Mise à jour : 19 janvier 2016 | 7:00
       
      Maison des jeunes de Saint-Henri: 900 000$ pour un nouveau toit
       
      Par André Desroches
      TC Media
       

      La maison des jeunes serait construite en face de la caserne de pompiers, sur une partie du terrain occupé présentement par le stationnement public de la Ville de Montréal.
      André Desroches / TC Media
       
      La maison des jeunes La Galerie de Saint-Henri devra déménager dans deux ans. Elle souhaite le faire sur la Place Saint-Henri, dans un bâtiment construit au coût de 900 000$ qui deviendrait l’élément d’un pôle jeunesse dans ce secteur.
       
      L’organisme fondé en 1980 devra quitter à l’été 2018 le local qu’il loue depuis plus de trente ans sur la rue Notre-Dame (au 3643). Le propriétaire a d’autres projets pour le bâtiment.
       
      La maison des jeunes serait construite en face de la caserne de pompiers, sur une partie du terrain occupé présentement par le stationnement public de la Ville de Montréal.
       
      Le bâtiment de deux étages aurait une superficie totale de 467 mètres carrés. Les espaces pour les activités des jeunes seraient aménagés au rez-de-chaussée. À l’étage, il y aurait des bureaux pour le personnel ainsi que des salles pour des réunions et les rencontres d’aide aux devoirs.
       
      Les plans prévoient une terrasse sur le toit pour des activités d’agriculture. «Nous visons un toit vert», signale Cathy Anglade.
       
      Créer un pôle jeunesse
      Pour développer le projet, l’organisme bénéficie de l’appui de l’arrondissement du Sud-Ouest, qui souhaite repenser ce lieu névralgique.
       
      «Nous voulons revoir les aménagements de la Place Saint-Henri. On voudrait en faire un pôle jeunesse», explique le maire Benoit Dorais, rappelant la présence dans cette zone de l’école secondaire Saint-Henri, des Loisirs Saint-Henri et de l’école primaire Ludger-Duvernay.
       
      «Nous voulons faire de la place un pôle public comme quand elle a été créée», ajoute le maire, mentionnant qu’un exercice de réflexion sur l’aménagement de la place ayant réuni des universitaires s’est tenu en 2013. Selon lui, la population en général va y trouver son compte.
       
      Campagne de financement
      Benoit Dorais est en discussion avec la ville-centre afin de conclure un bail de longue durée pour le terrain convoité. «Nous voudrions signer une entente avec la Ville pour une emphytéose. Ça avance», indique-t-il. Mais pour que la Ville puisse voter en faveur du projet, il faut qu’il soit viable financièrement».
       
      La maison de jeunes doit recueillir près de 1 M$. Pour y arriver, l’organisme doit dénicher des partenaires majeurs.
       
      «Nous allons lancer notre campagne en février auprès des entreprises et des commerces», annonce Cathy Anglade. L’organisme ciblera également les fondations. La population pourra appuyer le projet à sa façon lors d’activités grand public de collecte de fonds.
       
      Chaque année, environ 150 jeunes âgés de 11 à 18 ans participent aux activités de la maison La Galerie.
    • Par ScarletCoral
      via la Voix Pop
       
      15/01/2016 Mise à jour : 15 janvier 2016 | 13:06
       
      Projet de 135 condos sur la rue Saint-Rémi
       
      Par André Desroches
      TC Media
       

      L'immeuble résidentiel de quatre étages serait construit au 767, Saint-Rémi, là où l'on trouve présentement un bâtiment industriel inoccupé, ainsi que sur le terrain contigu.
      André Desroches / TC Media
       
      Un projet résidentiel comptant 135 unités d’habitation, essentiellement des copropriétés et quelques logements sociaux, pourrait voir le jour sur la rue Saint-Rémi dans le quartier Saint-Henri.
       
      L’immeuble serait construit au 767, Saint-Rémi, là où l’on trouve un bâtiment industriel inoccupé, ainsi que sur le terrain contigu.
       
      Selon ce qu’a appris TC Media, il inclurait 14 logements sociaux et 14 logements abordables.
       
      Il s’agirait d’un bâtiment de quatre étages. Le règlement d’urbanisme de l’arrondissement du Sud-Ouest prévoit pour ce secteur des immeubles de 2 à 3 étages. Le projet, qui déroge à cette norme, pourrait faire l’objet d’un projet particulier de construction.
       
      La table de concertation Solidarité Saint-Henri a organisé deux rencontres en décembre et janvier pour présenter le projet aux résidents qui demeurent dans le Village des tanneries, là où le bâtiment serait érigé. Le Village des tanneries, cette petite enclave située à l’extrémité ouest de Saint-Henri, est délimité par les rues Cazelais, Saint-Rémi et Desnoyers et la voie ferrée.
       
      Opposition du POPIR
      Bien qu’il ne s’agisse pour le moment que d’une proposition préliminaire, le promoteur n’ayant déposé aucun projet formel à l’arrondissement, le POPIR-Comité Logement affiche d’emblée son opposition.
       
      «Notre mandat, c’est zéro condo», déclare Fred Burrill, organisateur communautaire au POPIR.
       
      C’est un non catégorique même si le projet prévoit l’inclusion de logements sociaux. «Nous ne sommes pas pour la construction de logements sociaux à n’importe quel prix», souligne M. Burrill.
       
      Selon le POPIR, ce type de développement résidentiel ne répond pas aux besoins des locataires de Saint-Henri, dont le revenu médian est de 25 395$. «Nous voulons le plus possible que le quartier demeure un quartier populaire», insiste Fred Burrill pour qui la multiplication de projets de condos ne fait qu’accélérer l’embourgeoisement du quartier.
       
      «Nous n’avons pas encore de position», indique pour sa part Shannon Franssen, coordonnatrice de Solidarité Saint-Henri. Le Comité aménagement de la table de concertation doit se réunir au début de février pour faire le point dans ce dossier.