Aller au contenu

Tour des Canadiens 3 - 53 étages (2020)


IluvMTL

Messages recommendés

  • Réponses 1,6k
  • Créé il y a
  • Dernière réponse

Membres prolifiques

What the actual eff is that!?  

Also, TDC2 seems to be completely changed too.....and different from their own posters around the job site!  

Enough of this already.  I'm doubting the entire QUAD vision now.  

Lien vers le commentaire
Partager sur d’autres sites

30 minutes ago, SKYMTL said:

So nice of them to talk all about inspiration and whatnot but then avoid posting any renderings.  

Based on the 567 unit count though, at 55 floors this will be MUCH wider than TDC2 or the condos will be MUCH smaller. Man that's a lot of units.....

Works out to a little under 11 units a floor over 53 floors and with larger appartements up top the count may a little higher for some of the lower floors so yeah that's a lot of potential people to stuff in there!  

Lien vers le commentaire
Partager sur d’autres sites

il y a 8 minutes, swansongtoo a dit :

Works out to a little under 11 units a floor over 53 floors and with larger appartements up top the count may a little higher for some of the lower floors so yeah that's a lot of potential people to stuff in there!  

C'est 49 étages hors sol. 

Lien vers le commentaire
Partager sur d’autres sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.




×
×
  • Créer...