SELBY - 7 étages


monctezuma

Messages recommendés

  • 1 mois plus tard...

Tu vois, moi j'adore la partie supérieure blanche! Je trouve qu'elle "fit" très bien dans l'ensemble du bâtiment et lui donne un look très "industriel"!

Bref, l'ensemble du projet est vraiment incroyable! On en veut plus des projets comme celui-ci!:awesome:

Lien vers le commentaire
Partager sur d’autres sites

Moi aussi j'aime. Le projet respecte bien l'ancienne usine sans trop l'écraser vs. le projet LeSage au Piano de Sainte-Thérèse ( http://www.mtlurb.com/forums/showthread.php/18092 ) qui écrase littéralement l'ancienne usine de piano et la fait même malheureusement disparaitre.

Lien vers le commentaire
Partager sur d’autres sites

  • 4 mois plus tard...
  • 3 semaines plus tard...

Ground breaks on Westmount, Quebec complex

PATRICIA WILLIAMS

staff writer

 

The firm of SelbyCampus Inc. has broken ground in the Montreal borough of Westmount on a project that is expected to become one of the province’s largest LEED-certified residential complexes.

 

Housed in a building that once accommodated pharmaceutical company Charles E. Frosst and later Dawson College, the SELBY condominium development has been designed to reduce its environmental footprint as much as possible, while optimizing energy efficiency. The project will incorporate a system of geothermal heating and air conditioning, central heat exchangers, triple-glazed, low-emission fenestration and passive solar heating.

 

SelbyCampus Inc. president Roland Hakim said LEED Gold is being targeted for the 250,000-square-foot project. The development ultimately will house 164 units on six floors. Originally constructed in 1926, the building was acquired by developers Roland and Sami Hakim in 1999. The massive industrial structure features reinforced concrete. The core components of the original structure are being preserved.

 

The project is being constructed in three phases, at an estimated cost of $40 million. Phase One, which includes 42 condominium units, is scheduled for completion in June 2013.

 

The project includes rooftop villas with panoramic views, gym, pool, a heated, 110-unit interior parking facility, and 40,000 square feet of gardens and exterior recreational facilities. A recharge station for electric vehicles is one of the building’s environmentally friendly features.

 

The project is being undertaken by a team that includes architects Architem, mechanical and electrical engineers Mespecs Inc., structural engineers BCA Consultants Inc., and energy and LEED consultants Genivar. Contractor is Exeter Construction Inc.

 

Lien: http://dcnonl.com/article/id50553/--ground-breaks-on-westmount-quebec-complex

Lien vers le commentaire
Partager sur d’autres sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.


Countup


×
×
  • Créer...