Aller au contenu

Messages recommendés

Finally the huge crappy industrial building on the southeast side of Jarry and Viau is either going down or it'll be part of a large redevelopment!! The block is completely fenced in and the walls are being stripped and all the insides are being gutted..Let's hope for the first 20+ storey tower for the east end...the project belongs to the very deep pocketed Saputo clan and their associates.:stirthepot:

Lien vers le commentaire
Partager sur d’autres sites

  • 4 semaines plus tard...
  • Réponses 28
  • Créé il y a
  • Dernière réponse

Membres prolifiques

just a quick update. the building is about half demolished. A drawing of the project is up it looks like a podium with 2 towers a 10 or 12 storey and a 15 to 20 storey next to it. Pharmaprix as an anchor tenant in the podium. I'll try to get some photos..St.Leo is hot!!The Mach Group...I think it's part of the Saputo family??

Lien vers le commentaire
Partager sur d’autres sites

Je me demandais quel était ce fameux projet jusqu'à ce que tu nomme le groupe Mach.

Voici le projet initial :

 

5263437102_4c630289f3.jpg

 

http://www.groupmach.com/33-27-detail_espace_Nombreux_espaces_disponibles.html

 

Mais le site ne parle pas de tours ! On aura peut-être droit à une autre belle surprise. Prends des photos !!

Lien vers le commentaire
Partager sur d’autres sites

Here are some pictures that i took with my blackberry. The 2 pictures with the ? and ? bientot are further east on Jarry. A bunch of run down HLM slums were torn down. Some new project is going up soon according to my neighbour who ran the demolition and put up the interesting ? sign. More to come!!

 

 

IMG00169-20101215-1252.jpg

 

IMG00167-20101215-1209.jpg

 

IMG00159-20101209-1207.jpg

 

IMG00143-20101127-0916.jpg

 

 

IMG00142-20101127-0916.jpg

 

 

IMG00141-20101127-0916.jpg

 

IMG00138-20101126-1212.jpg

 

IMG00168-20101215-1252.jpg

Lien vers le commentaire
Partager sur d’autres sites

  • 5 mois plus tard...
  • 4 mois plus tard...

The brick exterior is almost complete and most of the windows are installed. Pharmaprix and the Viau medical clinic will be the major tenants. Two residential buildings are in the works also 8 and 13 floors. However I don't know if the residential phase will start right away.

Modifié par monctezuma
Lien vers le commentaire
Partager sur d’autres sites

  • 2 mois plus tard...

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Invité
Répondre à ce sujet…

×   Vous avez collé du contenu avec mise en forme.   Supprimer la mise en forme

  Seulement 75 émoticônes maximum sont autorisées.

×   Votre lien a été automatiquement intégré.   Afficher plutôt comme un lien

×   Votre contenu précédent a été rétabli.   Vider l’éditeur

×   You cannot paste images directly. Upload or insert images from URL.




  • Les dernières mise à jour

    1. 80

      Rénovation de l'Hôtel de ville de Montréal

    2. 80

      Rénovation de l'Hôtel de ville de Montréal

    3. 769

      Aéroport Montréal-Trudeau (YUL) - Discussion générale

    4. 3 585

      Série de vieilles photos de Montréal

×
×
  • Créer...