Aller au contenu

Rechercher dans la communauté

Affichage des résultats pour les étiquettes 'completed'.

  • Rechercher par étiquettes

    Saisir les étiquettes en les séparant par une virgule.
  • Rechercher par auteur

Type du contenu


Forums

  • Projets immobiliers
    • Propositions
    • En Construction
    • Complétés
    • Transports en commun
    • Infrastructures
    • Lieux de culture, sport et divertissement
  • Discussions générales
    • Urbanisme, architecture et technologies urbaines
    • Photographie urbaine
    • Discussions générales
    • Divertissement, Bouffe et Culture
    • L'actualité
    • Hors Sujet
  • Aviation MTLYUL
    • YUL Discussions générales
    • Spotting à YUL
  • Ici et ailleurs
    • Ville de Québec et le reste du Québec
    • Toronto et le reste du Canada
    • États-Unis d'Amérique
    • Projets ailleurs dans le monde.

Blogs

  • Blog MTLURB

Rechercher les résultats dans…

Rechercher les résultats qui…


Date de création

  • Début

    Fin


Dernière mise à jour

  • Début

    Fin


Filtrer par nombre de…

Inscription

  • Début

    Fin


Groupe


Location


Intérêts


Occupation


Type d’habitation

10 résultats trouvés

  1. http://www.bbc.com/travel/feature/20131002-business-trip-montreal As one of Canada's largest cities, Montreal stands out from the pack for its combination of big city ambiance and small-town neighbourhoods, European flair and North American attitude. The confluence of culture and economy has also transformed the city – the second largest French-speaking city in the world – into a business hub for numerous industries, including aviation, banking and insurance. Operating a strong North American and transatlantic hub from Montreal-Trudeau International Airport, Air Canada has been a key driver behind the 1.4 million business travellers that arrived in Montreal in 2012. The airport (a 20km taxi ride from downtown clocks in at a flat 40 Canadian dollars) recently completed the first phase of its C$261 million expansion project named Gate 62, and the second stage will begin construction in 2014, adding six new wide body gates, including two equipped for the Airbus A-380 jumbo jet. ...
  2. Même si notre hôtel de ville actuel est très beau, l'ancien était splendide. Construction on the building began in 1872 and was completed in 1878. The building was gutted by fire in March 1922, leaving only the outer wall and destroying much of the city's historic records. Source : http://www2.ville.montreal.qc.ca/archives/democratie/democratie_en/expo/reformistes-populistes/construction/piece1/index.shtm Source et texte entier : http://en.wikipedia.org/wiki/Montreal_City_Hall Après l'incendie : http://www2.ville.montreal.qc.ca/archives/democratie/democratie_en/expo/reformistes-populistes/construction/piece12/index.shtm
  3. i'm posting this cause i can't seem to find any information about it on ssp, emporis, or anywhere else for that matter; i stumbled upon it by "accident" searching for something else on google the other day, and so far, all the news site that mention this project all seem to be from china, india or elsewhere in asia: http://www.todayonline.com/World/EDC101209-0000196/Wuhan-to-have-worlds-3rd-tallest-building Wuhan to have world's 3rd-tallest building SHANGHAI - The Shanghai Greenland Group yesterday said it will invest 30 billion yuan ($5.9 billion) to develop the world's third-tallest building in Wuhan and reported revenue that will help rival the nation's biggest publicly traded developer. The company, set up in 1992 after former Chinese leader Deng Xiaoping's historic tour of southern provinces, will build the 606m Wuhan Greenland Centre in the central Chinese city. The three million sq m property will include luxury hotels and apartments and a conference centre when it is completed in five years, it said. "Wuhan is a very important city in central China," company chairman and president Zhang Yuliang said in an interview in Wuhan. "It's transiting from a regional centre to an international city - it has a huge market potential and it's necessary to construct a landmark building here." The new building in Wuhan, located about 900km west of Shanghai, will be higher than the 492m World Financial Centre in Shanghai, now the tallest tower in China. It will only be dwarfed by the 632m Shanghai Tower, scheduled to be completed in 2014, and the Burj Khalifa in Dubai, the world's tallest at 828m. Wuhan was ranked by ECA International this month as Asia's 25th most expensive city for expatriates, beating locations including Mumbai and Kuala Lumpur. Bloomberg
  4. Fri, 11/12/2010 - 19:33 A construction crew in the south-central Chinese city of Changsha has completed a 15-story hotel in just six days. Yahoo Check the U-Tube video...Freaked -out!! http://content.the-lefthander.com/drupal/aggregator/categories/2?page=3 :dizzy::applause:
  5. Renduring Completed Built: 2006 Its on the McGill campus. Matrox, President paid $10 million to cover part of the costs.
  6. Read more: http://www.montrealgazette.com/Quebec+highest+acquittal+rate+Country/3338332/story.html#ixzz0v6w8XDYg Wow, this is not good.
  7. Can We Afford Liberalism Now? Paul Johnson 10.29.08, 6:00 PM ET Forbes Magazine dated November 17, 2008 The financial crisis, detonated by greed and recklessness on Wall Street and in the City of London, is for the West a deep, self-inflicted wound. The beneficiary won't be Russia, which, with its fragile, energy-based economy, is likely to suffer more than we shall; it will be India and China. They will move into any power vacuum left by the collapse of Western self-confidence. If we seriously wish to repair the damage, we need to accept that this is fundamentally a moral crisis, not a financial one. It is the product of the self-indulgence and complacency born of our ultraliberal societies, which have substituted such pseudo-religions as political correctness and saving the planet for genuine distinctions between right and wrong and the cultivation of real virtues. India and China are progress-loving yet morally old-fashioned societies. They cannot afford liberalism. Their vast populations have only recently begun to emerge from subsistence living. Their strength is in the close, hard-working family unit in which parents train their children to work diligently at school and go to university when possible so they can acquire real and useful qualifications to then go out into the world as professional men and women determined to reach the top. I am impressed at the rapid headway Indians (benefiting from their knowledge of spoken and written English) are making in all the advanced sectors of the global employment market--science, technology, medicine, communications, the law, engineering and mining. They are ousting Westerners from top jobs, and rightly so. They are better qualified, more highly motivated and more reliable and honest. They have the old-style work ethic that we, in many cases, have lost. Prime Minister Margaret Thatcher was sneered at for stressing the Victorian virtues of industry and thrift. But she was right. These emergent Asian professionals have precisely those virtues, which is why they're moving forward and will eventually conquer the world--not by force but by hard work, intelligence and skill. Equally impressive is the sheer physical power of the Chinese workforce. Anyone who goes to Beijing or Shanghai can't help but notice the astonishing speed at which buildings are rising. There is nothing new in this. It was once the West that taught the world how to change its skylines through fast and furious efforts. One of the first examples was the Eiffel Tower, designed by engineering genius Gustave Eiffel (who also created the Statue of Liberty's internal structure). It was the centerpiece of the Paris Exposition of 1889. Using the principles of prefabrication, the 150 to 300 workers on the site put it up in only 26 months. Another example is the Empire State Building, which officially opened on May 1, 1931. Masterpiece of the firm of Shreve, Lamb & Harmon, the Empire State Building was completed in only one year and 45 days, a testament to business efficiency and the determination of the dedicated workforce. We couldn't match those time frames today, despite the advances in technology, because the advances have been outstripped by an even more rapid growth in complex and idiotic planning procedures, bureaucracy, myopic trade unionism and restrictive legislation. Wake-Up Call In London today, for example, residents are infuriated and visitors horrified by the way in which the main sewer and water lines are being replaced over much of the city. The work is agonizingly slow. Contractors claim they are paralyzed by the laws (especially so-called health and safety regulations) that now govern work practices. Depending on the type of activity, these regulations can lower productivity by 15% to 25%. They don't save lives or prevent injuries; they provide lucrative jobs for bureaucrats and fit in well with the ideas of union officials on how things should be run. They are a typical by-product of a liberal society. In an earlier age New York City would have defied the terrorists who brought down the World Trade Center by speedily rebuilding what they destroyed. What's happened instead is a sad and revealing story. In August China pulled off a propaganda triumph with its staging of the Summer Olympic Games, which involved huge construction projects--all completed on time. London is currently preparing for the 2012 games. All indications, so far, are that this is going to be an embarrassing and hugely expensive fiasco. I don't know whether this year's financial catastrophe will shock the politicians and people of the West into a new seriousness. There's certainly no sign of it yet. I had to laugh when a Chinese visitor recently said to me: "I see you're going back to the windmill in Britain. We Chinese cannot afford that." That comment puts things in a nutshell: We are traveling along the high road to incompetence and poverty, led by a farcical coalition of fashionably liberal academics on the make, assorted eco-crackpots and media wiseacres. This strain of liberalism is highly infectious. The Indians and Chinese have yet to be infected. They're still healthy, hard at work and going places, full speed ahead. Paul Johnson, eminent British historian and author; Lee Kuan Yew, minister mentor of Singapore; Ernesto Zedillo, director, Yale Center for the Study of Globalization, former president of Mexico; and David Malpass, chief economist for Bear Stearns Co., Inc., rotate in writing this column. To see past Current Events columns, visit our Web site at http://www.forbes.com/currentevents.
  8. August 7, 2008 VIA plans to invest $25 million to modernize Ottawa-Montreal railway infrastructure MONTREAL As part of the Government of Canada’s $692 million dollar investment to improve passenger rail service, VIA Rail Canada has announced it plans to invest more than $25 million on a multi-phase, multi-year program to modernize key parts of its rail infrastructure between Ottawa and Montréal. These improvements are part of VIA Rail’s overall capital investment plan. In this first phase, upgrades to the Ottawa-Montréal line will include the addition of a .76-km long passing track (siding) approximately 16 kilometres east of Ottawa, near Carlsbad Springs, a project which will be carried out by PNR RailWorks Inc. The siding will be constructed with remote-controlled power switches tied into the existing Centralized Traffic Control (CTC) system and Rail Traffic Control (RTC) dispatch system. The siding will also be equipped with a back track (additional track adjacent to the siding) for the storage of maintenance equipment, when required. VIA will also be installing new continuously-welded rail and performing other associated track work over some 40 track-miles between Coteau, Québec and Moose Creek, Ontario. This work, which is expected to be completed within the next few months, will be carried out by Total Track. Some trains on the Montréal-Ottawa route may experience minor delays while this work is being completed. Additionally, structural rehabilitation of the bridge over the South Nation River in Casselman, a project which has been awarded to SEMA Railway Structures, will also be completed. Improvements to VIA’s Ottawa station are also planned. VIA will be modernizing and improving the layout of the public washrooms, ticket office, baggage operations and Panorama (VIA 1) lounge. The lounge will also be enlarged to accommodate increased demand. As part of these renovations, VIA will be making both technological and environmental improvements to the station. The general contractor chosen for the project is Terlin Construction Ltd. of Ottawa. CSV Architects Inc. and Norr Ltd., also of Ottawa, will provide design and engineering support. Work on this project, worth some $500,000, will begin shortly and is expected to be completed by this fall. “These initiatives will improve comfort, speed, ride quality and reliability,” said VIA Rail president and chief executive officer Paul Côté. “They will also enhance overall safety, and increase scheduling flexibility and capacity for additional trains. Just as importantly”, he noted, “a more efficient operation will also contribute to reductions in fuel consumption and greenhouse gas emissions.” “The projects on VIA’s Montréal-Ottawa route are part of the $692 million in new funding this government announced in 2007 as part of its commitment to providing Canadians with safe, reliable and sustainable passenger rail service,” said federal Transport Minister Lawrence Cannon.
×
×
  • Créer...