Elv13
Membre-
Compteur de contenus
121 -
Inscription
-
Dernière visite
Type de contenu
Profils
Forums
Calendrier
Galerie
Blogs
Tout ce qui a été posté par Elv13
-
ville-marie 900, rue Saint-Jacques – 62 étages
Elv13 a répondu à un sujet de Feanaro dans En Construction
Du bureau (de Google) -
ouest-de-lîle REM - Antenne Ouest
Elv13 a répondu à un sujet de mtlurb dans Réseau express métropolitain
-
Not by that much. The planned one-line in Seattle/Tacoma/Everett is ~102km. Some S-bahn lines in Germany are about 90km. I agree it's the wrong type of train (an ICE would be ideal), but it's not that much of a stretch to use a REM with elevated crossings, even to Gatineau/Ottawa. The economy of scale kicks in and having them fully integrated in the Opus helps the logistics.
- 85 réponses
-
- montréal
- sherbrooke
-
(et 1 en plus)
Étiqueté avec :
-
ville-marie 1250, rue Sanguinet (Espace Lab ESG UQÀM) - 6 étages
Elv13 a répondu à un sujet de IluvMTL dans En Construction
from Hôtel Chrome -
ville-marie La Tour Fides - 19 étages
Elv13 a répondu à un sujet de mtlurb dans Projets oubliés et/ou en suspens
from Hôtel Chrome. -
Nouveau Bureaux Google Montreal ( 425 Viger ouest)
Elv13 a répondu à un sujet de ça coute cher dans Complétés
La vue est assez impressionnante aussi. Ca fait plus N-Y que MTL de ce point de vue la. Pour référence, ceci est la vue du bureau de N-Y: Le siège social ressemble plus a Laval que le reste des campus... -
griffintown KAI (215 - 225, rue Murray) – 22, 8, 8 étages
Elv13 a répondu à un sujet de mtlurb dans Griffintown
Je vis a San-Francisco en ce moment. Cette image est l’équivalent de Villeray. C'est pas centrale et ca date d'apres l'age d'or des triplex. Ceci dit, c'est assez commun d'avoir des fils electrique comme ca meme dans les quartier beaucoup plus historique. A vancouver aussi. Construire quoi que ce soit a San-Francisco est vraiment difficile et il y a beaucoup de paperasse. Voici le resultat. -
ville-marie Place Banque Nationale - 40 étages
Elv13 a répondu à un sujet de _mtler_ dans En Construction
-
rosemont-la-petite-patrie Centre de Transport Bellechasse
Elv13 a répondu à un sujet de Moi dans Transports en commun
-
Sorry for the blur
-
ville-marie Coopérative d'habitation (Saint-Antoine et de la Montagne) - 8(?) étages
Elv13 a répondu à un sujet de nephersir7 dans Projets oubliés et/ou en suspens
Si il y en avait, quelqu’un aurait fait une post. Mais retiens pas ton souffle. L'autre coop de la montagne a genre pris 10 ans. La dernere COOP / CHSLD de Griffintown a des rendus depuis 4 ans et pas une pelle de terre. Ce genre de projet est tres lent a sortir de terre. -
rosemont-la-petite-patrie École à pas de géants (Angus) - 3 étages
Elv13 a répondu à un sujet de Ricardo100 dans Petits Projets
If you look at the previous picture, it's bedrock. So they don't need a foundation. Foundations are dug in Canada/Quebec to get below the the ground which freezes. It has to be because freeze/thaw cycle would crack the walls after a few years. But that only applies to actual soil. Here, the bedrock wont move much, if at all. So a simple slab is enough. Primary schools don't all have a basement. Mine didn't (built in brutalist style from in the 60's). When they built a condo block next to it, I can confirm the bedrock was like 2 feets from the surface. Same as this site. They used dynamite and it was pretty cool for a 7 years old to see this from the edges of the playground. I suggest this video: -
ville-marie Le Balt - 15 étages
Elv13 a répondu à un sujet de Fortier dans Projets oubliés et/ou en suspens
Works pretty well actually https://en.wikipedia.org/wiki/Flak_tower There has been many attempts to destroy these things over the years. Most still stand because they ran out of budget trying to bring them down after the war. Place Bonaventure contains *a lot* of concrete too. The outer walls don't have enough to survive an indirect nuke stroke, but the superstructure has. I am not super certain about the foundations. It's built on pillars on top of rail lines. It goes to bedrock (because it sits near the surface on that site), but I don't know how strong the base slab is.- 151 réponses
-
- 1
-
- locatif
- résidentiel
-
(et 1 en plus)
Étiqueté avec :
-
ouest-de-lîle Station YUL-Aéroport-Montréal-Trudeau - Discussion
Elv13 a répondu à un sujet de mtlurb dans Réseau express métropolitain
If I recall correctly, ages ago there was some pictures of the "old" station they built for the previous iteration of the REM (under the Marriott?). I can't find them anymore. Some old forum thread got deleted? Google don't return good results either. -
ville-marie La Tour Fides - 19 étages
Elv13 a répondu à un sujet de mtlurb dans Projets oubliés et/ou en suspens
Il y a de faibles changes que ce soit due a ceci -
ville-marie 1 Square Phillips - 61, 21, 14 étages (Projet global)
Elv13 a répondu à un sujet de mtlurb dans En Construction
This is a logistic choice. The site that would otherwise be totally surrounded if not for the access road to the bottom of the hole. For the tallest tower, they need the most raw material. So having this access road really allows them to bring material without a traffic jam and to store many days of material on site. It's a win-win really. If they had built the from facing buildings first, they would leave the site fully surrounded and many it logistically challenging to build the tower. -
rosemont-la-petite-patrie Centre de Transport Bellechasse
Elv13 a répondu à un sujet de Moi dans Transports en commun
It was just a normal flight from Vancouver actually. The angle if perfect for photos. You arrive from over Mont-Tremblant insstead of the south like Toronto/US-East flights. Plus, it was 6pm, so the sun was directly behind the plane -
rosemont-la-petite-patrie Centre de Transport Bellechasse
Elv13 a répondu à un sujet de Moi dans Transports en commun
18 Septembre -
outremont Le Nouvel Outremont (Projet global)
Elv13 a répondu à un sujet de mtlurb dans En Construction
18 septembre -
18 Septembre
- 1 215 réponses
-
- 8
-
- bleury
- gwl realty advisors
-
(et 1 en plus)
Étiqueté avec :
-
18 Septembre
-
rive-nord Le Sélection Repentigny - 30 étages
Elv13 a répondu à un sujet de LeTravailleur dans En Construction
18 Septembre -
18 Septembre
-
18 Septembre