Digtoast

Membre
  • Compteur de contenus

    18
  • Inscription

  • Dernière visite

Réputation sur la communauté

16 Good

À propos de Digtoast

  • Rang
    Junior Member

Personal Information

  • Biography
    I'm currently studying at McGill
  • Location
    Montreal
  • Intérêts
    Video Games, tv shows, construction projects
  • Occupation
    Student
  1. Humaniti - 39 étages

    Je pense que ça fait partie du projet Brix.
  2. Brix (400 Dowd) - 6, 16 étages

    la base est en train d'être installée en ce moment
  3. Brix (400 Dowd) - 6, 16 étages

    Le 20 Août: La grue est en place.
  4. Îlot Balmoral / ONF - 13 étages

    Le 20 Août:
  5. TOM Condos - 42 étages

    The end might actually be in sight with this project; the crane was removed today.
  6. Humaniti - 39 étages

    29 Juin
  7. Îlot Balmoral / ONF - 13 étages

    29 Juin
  8. Humaniti - 39 étages

    and so it begins. Looking forward to seeing this one develop.
  9. Brix (400 Dowd) - 6, 16 étages

    Aujourd'hui:
  10. Îlot Balmoral / ONF - 13 étages

    Got some closeups:
  11. TOM Condos - 42 étages

    I wonder what's taking this project so long to finish. It feels like it hasn't really changed in months now.
  12. Tour des Canadiens 2 - 53 étages

    hier
  13. Humaniti - 39 étages

    That was moved from the Dowd site a few weeks to a month ago. I was sure that it was a sign that work was about to start, but it looks like I was wrong. Hopefully the delay isn't much longer.
  14. Brix (400 Dowd) - 6, 16 étages

    Just to clear a few things up: The first floor used to extend all the way to the back of the building (the part that is being demolished). Last summer they were pouring concrete in there, which I assumed at the time was for a new floor for the restaurant, but now I'm thinking they were building a wall to separate the two parts. Here's a list of all the work that has been done this week -removal of the parking lot asphalt -removal of the 2 trees -removal of the Bell phone booth on Bleury -removal of the billboard sign framework on the side of 1076 Bleury -partial removal of the back half of the first floor of 1076 Bleury (should be done by next week) Also, I received some information on the upcoming Dowd project (no renders sadly) 1) The building of the « Dowd Project » will have 16 stories and will be entirely made of rental apartments. 2) The West end of the building, where the « historical facade » is located, will have 6 stories. 3) The underground parking entrance will be located on Dowd Street. 4) The garbage and recycling bins of the building will be taken out onto the Dowd Street. 5) A restaurant will be located on the ground floor on the Bleury street side and will include a terrace in the courtyard. 6) The construction of the building should start in January 2017 and will last about 2 years. Also, during the excavation of the underground garage, dynamite will be used. The completion of the entire project is expected by April 2019.
  15. Brix (400 Dowd) - 6, 16 étages

    New update. The parking lot on the corner of de Bleury and Dowd is now fenced off as of today. I also saw a surveying team there a few weeks ago, and some people on the lot carrying around a set of A0 size drawings back in September. All this makes me believe that we'll be seeing some more information about this project soon. Which makes sense; the whole area is seeing massive development, so there's probably a push to get this one going too.